Case Study #3 Getting the Profile Needed - Blastrac, NA

Posted by Denise Thayer on 08/03/2017

Parking structure job site with a broom finish concrete preparation need and additional two inches of concrete over the top of the existing substrate and required a CSP5 profile or greater. Blason Industrial used a Blastrac 2-20D shot blaster and paired it with the Blastrac 8-54DCGI Dust collector to remove traffic and parking stall lines while leaving behind the desired profile and accomplished this in one pass.  Having the desired CSP5 profile concrete was ready for additional concrete pour, no down time waiting for concrete to dry or be cleaned.

Case Study #3

Date: 6/7/2017

Location: Downtown Los Angeles, CA

Equipment Used: 2-20D Shot Blaster paired with 8-54DCGI Dust Collector

Company Name: Blason Industrial

Job Site Details:
20,000 sq. ft. of broom finish concrete preparation in a parking structure needing an additional 2 inches of concrete over the top of the existing substrate and required a CSP5 profile or greater.  Machine was removing all traffic and parking stall lines while leaving behind the desired profile in 1 pass. 

Share This

Post A Comment
(Will not be published)
 Refresh CAPTCHA Image
Captcha Image
 
Cancel